Surveys are unannounced, but they aren't evenly spread across the year. Three years of CMS data show clear busy and slow seasons, and that's useful for scheduling equipment PM, calibration and electrical safety testing.
Match with a qualified biomedical technician within 24 hours.
Each bar counts standard Life Safety Code surveys that resulted in at least one citation, by the month they happened, from September 2023 to August 2026.
February through May accounted for 10,115 surveys; July, August, October and November together accounted for 6,756. March and April were the busiest months; October was the slowest.
| When | What |
|---|---|
| Sept–Oct | Annual PM, calibration and electrical safety testing on all patient care equipment |
| Nov–Dec | Close out failed devices: repair, re-test, document |
| Jan | Audit the binder: inventory, reports, certificates, technician records |
| Monthly | Power strip walk-through, incoming testing for new/rental equipment |
Free tools: look up any nursing home's equipment citations and next survey window, or estimate your maintenance program.
Source: Medical Equipment Repair Network analysis of the CMS Provider Data Catalog, Nursing Homes: Fire Safety Deficiencies and Provider Information (processed September 2026). Counts are distinct standard surveys with at least one fire safety citation, for survey dates from September 2023 to August 2026.
Request a free quote for equipment repair, PM or electrical safety testing.