Every citation comes with a correction deadline. CMS records when each deficiency was actually corrected, which shows how long equipment-related problems really take to fix.
Match with a qualified biomedical technician within 24 hours.
| Tag | What it covers | Citations | Median days | 1 in 4 took longer than |
|---|---|---|---|---|
| K920 | Power strips & extension cords | 5,183 | 30 | 45 days |
| K919 | Use of electrical equipment | 751 | 26 | 38 days |
| K929 | Oxygen cylinder handling | 235 | 25 | 38 days |
| K923 | Oxygen & medical gas storage | 3,373 | 34 | 48 days |
| K918 | Generator testing | 7,751 | 35 | 51 days |
| K921 | PCREE testing & maintenance | 1,536 | 37 | 52 days |
| K914 | Bedside receptacles | 1,935 | 37 | 56 days |
| K927 | Oxygen transfilling areas | 295 | 42 | 63 days |
Quick fixes, like removing an improper power strip or changing how equipment is used, close in about a month. Anything that needs a technician, parts or a full testing round takes longer: PCREE testing (K921) and bedside receptacles (K914) had a median of 37 days, and a quarter took 56+ days for K914.
Free tools: look up any nursing home's equipment citations and next survey window, or estimate your maintenance program.
Source: Medical Equipment Repair Network analysis of the CMS Provider Data Catalog, Nursing Homes: Fire Safety Deficiencies and Provider Information (processed September 2026). Days to correct = CMS correction date minus survey date, for citations with a recorded correction date and survey dates from September 2023 to August 2026.
Request a free quote for equipment repair, PM or electrical safety testing.